March 2008 -
Reconstruction of the center section of Route 309/Ogontz Avenue south of Easton Road will require a partial detour of traffic from Greenwood Avenue and Trilogy apartments for most of March.
February 2008 -
Crews excavate for a water line along Norristown Road at the base of the northbound off ramp. Motorists are advised that traffic may back up on the ramp during peak travel times.
January 2008 -
Bridge demolition, pavement removal and widening operations continue along the northbound lanes of Route 309 north of Highland Avenue. Shown here is work on the northbound bridge over Susquehanna Avenue.
January 2008 -
Reconstruction continues in the southbound lanes at the Fort Washington interchange. Shown here is the expressway and the new southbound on-ramp passing under the turnpike.
January 2008 -
As part of northbound reconstruction in the northern section of Route 309, bridges over local roads are being widened. This picture shows construction on the overpass at Loch Alsh Avenue.
December 2007 -
Center area reconstruction is now underway from the Easton Road interchange to the Willow Grove Avenue overpass.