| To view a map of the advance work area, click here. Current construction activity is highlighted in red below: |
| Location and Description |
|
Bethlehem Pike and Stenton Avenue, Springfield Township Improvements completed. |
|
Bethlehem Pike and Stenton Avenue/Paper Mill Road, Springfield Township Improvements completed. |
|
Limekiln Pike (Rt. 152) and Fort Washington Avenue, Upper Dublin Township Improvements completed. |
|
Bethlehem Pike and Montgomery Avenue, Springfield Township Improvements completed. |
|
Bethlehem Pike and Haws Lane, Springfield Township Improvements completed. |
|
Bethlehem Pike and Wissahickon Avenue, Springfield Township Improvements completed. |
|
Bethlehem Pike, Bysher Road/College Avenue, Springfield Township Improvements completed. |
|
Bethlehem Pike and Mill Road, Springfield Township Improvements completed. |
|
Bethlehem Pike and Flourtown Shopping Center/Restaurant Drive, Springfield Township Improvements completed. |
|
Bethlehem Pike and W. Valley Green Road, Whitemarsh Township Improvements completed. |
|
Bethlehem Pike and E. Valley Green Road, Whitemarsh Township Improvements completed. |
|
Bethlehem Pike and Church Road (Rt. 73), Whitemarsh Township Improvements completed. |
|
Bethlehem Pike and Skippack Pike/Camp Hill Road, Whitemarsh Township Improvements completed. |
|
Bethlehem Pike and Highland Avenue, Upper Dublin Township Improvements completed. |
|
Bethlehem Pike and Dager Road, Lower Gwynedd Township Improvements completed. |
|
Susquehanna Road and Pinetown Road/Broad Street, Upper Dublin Township Improvements completed. |
| Susquehanna Road and Fort Washington Avenue, Upper Dublin Township Add left turn lanes on Susquehanna Road and provide a left turn arrow from westbound Susquehanna. Install new traffic signal controller and major signal equipment modifications. Improvements completed. |
| Church Road (Rt. 73) and Paper Mill/Oreland Mill Road, Springfield Township Widen the north side of Church Road to add left turn lanes on eastbound and westbound Church Road and on northbound and southbound Paper Mill Road. Install curb and drainage along north side of Church Road. Upgrade traffic signals. Improvements completed. . |
|
Church Road (Rt. 73) and Station Avenue/Sandy Hill Avenue in Springfield Township Improvements completed. |
|
Paper Mill Road between Stenton Avenue and Cheltenham Avenue in Springfield Township Improvements completed. |
| Limekiln Pike and Church Road (Rt. 73) in Cheltenham Township Widen the north and south sides of Church Road along Arcadia University to provide a left turn lane from eastbound Church Road to northbound Limekiln Pike. Install pavement markings to add a new left-turn lane from westbound Church Road to southbound Limekiln Pike. Add a left-turn lane from westbound Church Road into the Arcadia University driveways. Install a new drainage system and curbing. Upgrade traffic signals at Church Road and Limekiln Pike.
Improvements completed. |
| Limekiln Pike and Mt. Carmel Avenue/Edgehill Road in Abington Township Delineate the eastbound lanes on Mt. Carmel Avenue and lengthen the right turn lane on eastbound Mt. Carmel Avenue to southbound Limekiln Pike. Widen westbound Mt. Carmel Avenue at the Limekiln Pike / Mt. Carmel Avenue / Edgehill Road intersection to improve traffic flow around left turning vehicles. Install ornamental brick, tree pits and sidewalk.
Improvements completed. . |
| Limekiln Pike and Mt. Carmel Avenue (West) in Abington Township Add a right turn lane on Mt. Carmel Avenue. Upgrade traffic signals. Improvements completed. |
| Limekiln Pike (Rt. 152) and Susquehanna Road (East) in Upper Dublin Township Widen the shoulder of Limekiln Pike to extend the left and right turn lanes onto Susquehanna Road to increase capacity at the intersection. Install new drainage pipe. Synchronize signals with Limekiln Pike intersection at Virginia Dr./Dreshertown Rd. Improvements completed. |
| Limekiln Pike (Rt. 152) and Susquehanna Road (West) in Upper Dublin Township Install new pavement markings to delineate the through and turn lanes. Synchronize signals with Limekiln Pike intersection at Virginia Dr./Dreshertown Rd. Improvements completed |
| Limekiln Pike (Rt. 152) and Virginia Drive/Dreshertown Road in Springfield Township Widen the existing bridge over Pine Run to provide an additional through lane/right turn lane on southbound Limekiln Pike. Extend the right turn lane on northbound Limekiln Pike. Widen the south side and improve the alignment of Virginia Drive between Susquehanna Road and Limekiln Pike. Install new drainage, curb and ornamental brick. Synchronize signals with Limekiln Pike intersections at Susquehanna Road.
Improvements completed |
| Limekiln Pike (Rt. 152) between Jarrettown Road and Dillon Road in Upper Dublin Township Widen Limekiln Pike between Jarrettown Road and Dillon Road to add a left turn lane in both directions on Limekiln Pike at Jarrettown Road and Jarrettown Inn. Add a left turn lane in both directions on Limekiln Pike at Dillon Road and Meetinghouse Road. Add right turn lanes at Broad Street and the Temple Sinai. Remove the existing concrete slab bridge on Limekiln Pike near Dillon Road / Meetinghouse Road and replace it with a seven-foot wide by four-foot high box culvert. Install new traffic signals. Improvements completed. |
|
Limekiln Pike (Rt. 152) and Willow Grove Avenue in Cheltenham Township Improvements completed. |
|
Bethlehem Pike and Norristown Road/Sumneytown Pike in Lower Gwynedd Township Improvements completed. |
| Bethlehem Pike and Butler Pike in Upper Dublin Township/Ambler Borough Widen the northbound shoulder on Bethlehem Pike south of the Butler Pike intersection to add a right turn lane onto eastbound Butler Pike. Install ornamental brick paving on Butler Pike at entrance to Ambler Borough. Upgrade traffic signals; install stainless steel traffic signal poles. Improvements completed. |
| Bethlehem Pike and Penllyn Pike in Lower Gwynedd Township Synchronize with signals at Bethlehem Pk. and Norristown Rd./Sumneytown Pk. Improvements completed. |